  通風管道及部件的安裝,土建工程應根據風道安裝及暗安裝條件,有必要有一定條件進行。表面安裝或技能夾層內管道安裝,部分應安裝在通風管道工程和建筑完成或受到審查,畫完成,將來如果通風管安裝后,山東通風管道土木工程技術人員和其他操作,可能會損壞通風管,空氣凈化系統,特別是會使管道污染。對于安裝暗色安裝管道,應及時配合土建施工,否則會損壞土建裝修吊頂、墻面。
  The installation of ventilation pipes and components should be carried out in accordance with the conditions of installation of ventilation pipes and dark installation, and it is necessary to have certain conditions. Surface installation or skill installation of pipeline in sandwich should be partly installed in ventilation pipeline engineering and construction, or be examined and painted. In the future, civil engineering technicians and other operations of Shandong ventilation pipeline may damage ventilation duct, air purification system, especially the pipeline pollution if the ventilation duct is installed. For installation of dark pipes, civil construction should be coordinated in time, otherwise the ceiling and wall of civil decoration will be damaged.
  在施工過程中,特殊人員應該分配給密切合作與土木工程根據土木工程的時間表,以保證預埋件預留孔和鋪設,以避免材料的浪費,對土木工程的質量的影響。上班前一季度的安裝和安裝之前管道系統安裝前準備工作,應進一步驗證管和回(行)風口軸線和標高、等符合設計圖紙,并查看公民預留洞、預埋件的方向符合需求,根據施工計劃決定安排勞動力,和預制分支,懸掛,支架,風管按照施工順序安排運到現場。
  During the construction process, special personnel should be allocated to cooperate closely with civil engineering according to the schedule of civil engineering, in order to ensure the pre-embedded parts reserved holes and laying, in order to avoid waste of materials and the impact on the quality of civil engineering. Before the installation and installation of the pipeline system in the first quarter of work, the preparatory work before installation should further verify that the axis and elevation of the pipe and return (line) tuyere meet the design drawings, and check the direction of the reserved holes and embedded parts for citizens to meet the requirements. According to the construction plan, the labor force, prefabricated branches, suspensions, brackets and ducts should be arranged according to the construction plan. Sequence arrangement for delivery to site.
山東通風管道
  同時,施工輔助材料(螺栓、螺母、墊片和粘合劑、密封劑等)和必要的安裝材料也都準備好了,根據工作量和系統的多少節進行安裝。
  At the same time, construction auxiliary materials (bolts, nuts, gaskets and adhesives, sealants, etc.) and necessary installation materials are also prepared, according to the workload and the number of sections of the system for installation.
  可安裝風管首先需要的東西有:扳手、鋼絲鉗、螺絲刀、鋼鋸、錘子、扁鑿、沖頭、錘子、鋼帶、水平儀、滑輪、麻繩等。
  The first things needed to install the air duct are wrenches, wire pliers, screwdrivers, steel saws, hammers, flat chisels, punches, hammers, steel belts, levelers, pulleys, hemp ropes, etc.
上一篇:消聲器設備使用時需要注意哪些?
下一篇:垂直煙道的清洗方法有哪些?

推薦產品

  • 廚房排煙
  • 廚房排煙
  • 軸流風機
  • 不銹鋼制品

本站圖片均由網站所有方提供,部分圖片來源于網絡,如有任何疑問請及時與我們聯系,未經溝通本站不承擔相關法律責任!

彩票之家(深圳)集团有限公司 起点彩票(上海)集团有限公司 江苏五分(北京)集团有限公司 9号彩票(浙江)集团有限公司 1分6合(广东)集团有限公司 购彩助手(深圳)集团有限公司 大发11选5(广州)集团有限公司